Saturday, April 9, 2011
the list is getting smaller
So we had a dumpster delivered yesterday and Shawn and I cleaned out all the stuff I had torn out of the attic and the closet where the stairs will be. It took all of an hour to do this, which was much less time than I thought. I also have finished all but two baffles on the south side, torn up the floor boards (south side) and brought up a bunch of lumber that was crowding the garage. Today I hope to get the rest of the lumber to the attic, clean up some of the old insulation and get ready to move the other insulation over to the south side. I hope to get some more pics and up load them as well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment